[December 18, 2008] | [1.5 Hours] Plumbed and installed brake pedals |
[December 19, 2008] | [2 Hours] Trimmed subpanel for vent interference, magetometer tray |
[December 21, 2008] | [9.5 Hours] Installed tubing for electric fuel pump and filter; finished fuel line routing |
[February 12, 2009] | [3 Hours] Started mounting the EFIS magnetomer support tray |
[February 28, 2009] | [1.5 Hours] Mounted manifold pressure transducer; riveted magnetomer tray |
[March 2, 2009] | [2 Hours] Mounted magnetometer |
[August 18, 2009] | [2 Hours] Fixed interference with flap actuator channel |
[September 1, 2009] | [1 Hour] Painted floors misc stuff |
[September 3, 2009] | [2 Hours] Installed Floors |
[September 4, 2009] | [2.5 Hours] Installed flap position sensor |
[September 5, 2009] | [3 Hours] Stick grips / Flap motor wiring |
[September 7, 2009] | [6 Hours] Painted bottom cowl, stick wiring, engine ground |
[October 27, 2009] | [2 Hours] Bled the brakes |
[November 13, 2009] | [3 Hours] Installing stuff in panel; pitot/static plumbing |
[November 14, 2009] | [5 Hours] Power Point wired; sealed avionics tray; etc.. |
[November 15, 2009] | [4 Hours] Installed avionics, ELT wiring, painted map box |
[November 16, 2009] | [1 Hour] Attempted to put passenger warning label on |
[November 19, 2009] | [2 Hours] Installed map box and panel blanks |
[November 20, 2009] | [1 Hour] Started annunicator lights |
[November 22, 2009] | [3.5 Hours] Wired up annunicators, wrapping wires |
[November 23, 2009] | [2.5 Hours] Tying off wires ; took off canopy |
[November 29, 2009] | [3 Hours] Covered wires going up firewall, installed ELT. Installed controls |
[November 30, 2009] | [3 Hours] Routed control cables, work on canopy fairing |
[December 1, 2009] | [1.5 Hours] Canopy fairing |
[December 2, 2009] | [4.5 Hours] Canopy fairing heater FAB other stuff |
[December 3, 2009] | [0.5 Hours] Canopy fairing |
[December 9, 2009] | [2.5 Hours] Canopy fairing, control cable passthrough |
[December 10, 2009] | [0.5 Hours] Canopy Fairing |
[December 11, 2009] | [2 Hours] Finished main canopy fairing; pinhole filing |
[December 13, 2009] | [4 Hours] More canopy fairing, blast tube, rear window |
[December 14, 2009] | [1.5 Hours] test fit canopy |
[December 18, 2009] | [2 Hours] Canopy prep |
[December 19, 2009] | [6 Hours] Primed canopy fairing, painted rollbar |
[December 21, 2009] | [1.5 Hours] More painting and priming |
[December 22, 2009] | [0.75 Hours] Canopy and rollbar work |
[December 24, 2009] | [1 Hour] Riveted Canopy Frame |
[December 25, 2009] | [2 Hours] Finished installing rollbar |
[December 26, 2009] | [2 Hours] Started empennage fairing |
[December 27, 2009] | [4.5 Hours] Fiberglass work on empennage fairing painted stuff |
[December 28, 2009] | [4 Hours] Emp. fairing elevator trim servo |
[January 3, 2010] | [3.5 Hours] Worked on emp. fairing |
[January 4, 2010] | [2.5 Hours] Started installing rear window fairing work |
[January 5, 2010] | [3 Hours] Finished rear window, emp. fairing, misc stuff |
[January 6, 2010] | [3 Hours] Wired elevator trim tail light wiring more fairing work |
[January 7, 2010] | [3 Hours] Rigged elevator pushrods |
[January 9, 2010] | [0.5 Hours] Connected elevator pushrods |
[January 11, 2010] | [2.5 Hours] Back to work on the empennage fairings |
[January 12, 2010] | [0.5 Hours] More filling of aft end of empennage fairing |
[January 13, 2010] | [0.5 Hours] More fairing glassin' |
[January 15, 2010] | [2 Hours] Mounted left wing temporarily |
[January 16, 2010] | [2.5 Hours] Ran pitot line in wing drilled pitot tube to mount |
[January 19, 2010] | [2.5 Hours] Worked on wingtip landing lights |
[January 20, 2010] | [2 Hours] landing/taxi lights |
[January 22, 2010] | [4 Hours] Wingtip lights |
[January 23, 2010] | [8 Hours] Wingtips landing lights emp fairing tail light |
[January 24, 2010] | [1 Hour] Finished taillight mounting bracket primed emp fairing |
[January 25, 2010] | [4 Hours] Wingtip hinges Nav Antenna Mounted Emp Fairing |
[January 26, 2010] | [1.5 Hours] emp fairing misc |
[January 28, 2010] | [2 Hours] Rudder bottom fairing |
[January 30, 2010] | [1.5 Hours] Moved the wings to the airport + rudder tips + emp fairing |
[January 31, 2010] | [4 Hours] Finished empennage fairing installed bottom rudder tip |
[February 2, 2010] | [2 Hours] started top tips of rudder and vertical stablizer |
[February 5, 2010] | [5 Hours] Empennage Tips |
[February 8, 2010] | [2 Hours] Test Fit Seats, emp tips |
[February 10, 2010] | [3 Hours] Started fiberglassing rudder tips |
[February 11, 2010] | [3.5 Hours] Made seal for plenum rudder tips |
[February 15, 2010] | [4 Hours] Plenum Seal glassing empennage |
[February 16, 2010] | [1 Hour] Sanding and filling rudder tips |
[March 20, 2010] | [7 Hours] Fuselage move prep |
[March 21, 2010] | [5 Hours] Moved project to the hangar! |
[March 28, 2010] | [6 Hours] Installed left wing pitot installed |
[March 31, 2010] | [3 Hours] Rigged left aileron; pitot heat connected |
[April 2, 2010] | [4 Hours] Mounted right wing and propeller |
[April 3, 2010] | [2 Hours] Wired some of the right wing, rigged ailerons |
[April 7, 2010] | [2 Hours] Fuel sensor wire routing OAT sensor wired |
[April 13, 2010] | [1 Hour] Empennage Tips |
[April 16, 2010] | [3 Hours] More empennage tip filler work |
[April 17, 2010] | [1.5 Hours] Emp filling |
[April 18, 2010] | [3 Hours] More emp filling |
[April 21, 2010] | [2.5 Hours] Filled right elevator |
[April 25, 2010] | [4.5 Hours] Primed horizontal stab tips |
[April 26, 2010] | [2.5 Hours] Primed elevator tips |
[May 11, 2010] | [2 Hours] Filling rudder/vertical stabilizer tips |
[May 12, 2010] | [3.5 Hours] Hangar Organization Finished empennage tips! |
[May 14, 2010] | [2.5 Hours] Installed Empennage |
[May 15, 2010] | [2 Hours] Wired tail nav and strobe light |
[May 24, 2010] | [0.5 Hours] Fiberglassed NAV antenna to wingtip |
[May 25, 2010] | [2 Hours] Rudder pedal linkage torqued prop bolts |
[May 27, 2010] | [6 Hours] Prop Bolts - Alternator - Trim Tab - Lights |
[May 28, 2010] | [1 Hour] Painted rudder linkages and topcoated flap cover and seat backs |
[May 29, 2010] | [11 Hours] Too much little stuff to list! |
[May 30, 2010] | [4 Hours] Wingtip lights and trimming |
[June 1, 2010] | [5 Hours] Aft wingtip modification |
[June 2, 2010] | [1.5 Hours] Started on exterior cowl surface prep |
[June 5, 2010] | [7 Hours] Tech inspection, started to mount spinner, worked on "the list" |
[June 7, 2010] | [2 Hours] Top Cowl Exterior Finishing |
[July 9, 2010] | [4 Hours] Top Cowl Prep |
[July 13, 2010] | [2 Hours] Pinhole filling |
[July 16, 2010] | [2.5 Hours] Top Cowl Finishing |
[July 17, 2010] | [2 Hours] Top coated the top cowl |
[July 19, 2010] | [5 Hours] Bottom cowl work |
[July 20, 2010] | [4.5 Hours] Bottom cowl primed parts |
[July 21, 2010] | [4.5 Hours] Day at the hangar |
[July 28, 2010] | [2 Hours] Made a pre-oiler |
[July 30, 2010] | [5 Hours] pre-oiled engine |
[July 31, 2010] | [2 Hours] Fixed prop control bolt and removed emag wiring |
[August 1, 2010] | [8 Hours] Readied the engine for first start. |
[August 2, 2010] | [5 Hours] Wingtips and FIRST ENGINE START! |
[August 4, 2010] | [3 Hours] Right wingtip work |
[August 8, 2010] | [5 Hours] primed fwd skin, wingtips misc |
[August 9, 2010] | [4 Hours] Riveted on forward skin. Installed Canopy. |
[August 10, 2010] | [5 Hours] Installed Vents, Secured Fuel level wire, left wingtip lights |
[August 11, 2010] | [4 Hours] Wingtip antennas wired, lower cowl fitted |
[August 12, 2010] | [4 Hours] Worked on air intake neoprene adapters to plenum |
[August 16, 2010] | [4 Hours] Upper Cowl, Canopy Latch, other misc stuff |
[August 18, 2010] | [1.5 Hours] First Taxi Test! |
[August 19, 2010] | [3 Hours] Pitot-Static-Transponder Check |
[August 25, 2010] | [3 Hours] Finished painting interior panels |
[August 27, 2010] | [5 Hours] Tracked Prop and ELT antenna |
[August 28, 2010] | [5 Hours] Installed Interior |
[August 29, 2010] | [8 Hours] Weight and Balance, preparing for final FAA inspection |
[August 30, 2010] | [3 Hours] AIRWORTHY! |
[September 1, 2010] | [2 Hours] Started to put the airplane back together |
[September 2, 2010] | [2 Hours] Installed wing root fairings |
[September 7, 2010] | [3 Hours] Installing Panels, ect.. |
[September 9, 2010] | [3 Hours] Calibrated Capacitive Fuel Senders |
[October 14, 2010] | [2.5 Hours] Installed Canopy Weatherstrip |
[October 23, 2010] | [3 Hours] Installing access panels... |