Build Time: 2236 Hours
Flying & Maintenance Time: 1693 Hours
Builders Log
Builder Resources
|
Wing Kit Order
Wing Kit Inventory [8 Hours]
Spars [29.5 Hours]
| [September 14, 2006] | [1 Hour] Inspected main spars | | [September 15, 2006] | [0.5 Hours] Marked spars | | [September 16, 2006] | [1 Hour] Started work on spar nutplates | | [September 17, 2006] | [2 Hours] Countersunk spar for all nutplate rivets | | [September 18, 2006] | [2 Hours] Installed fuel tank nutplates | | [October 12, 2006] | [1 Hour] Finished fuel tank nutplates | | [October 13, 2006] | [0.5 Hours] Redid some countersinks | | [October 13, 2006] | [4 Hours] Finished nutplating/countersinking spars, started tie down brackets | | [October 14, 2006] | [0.5 Hours] Tie down bracket fabrication | | [October 16, 2006] | [2 Hours] Right tie down bracket | | [October 17, 2006] | [3 Hours] Finished tie down bracket, started rear spar | | [October 18, 2006] | [0.5 Hours] Prep to cut rear spars | | [October 19, 2006] | [1 Hour] Trimmed rear spars | | [October 22, 2006] | [3 Hours] Finished doublers. | | [October 23, 2006] | [2 Hours] Prep parts for priming | | [October 25, 2006] | [0.5 Hours] More rear spar priming prep | | [October 26, 2006] | [2 Hours] Primed spar components | | [October 27, 2006] | [3 Hours] Finished front and rear spars |
Wing [190.5 Hours]
| [October 28, 2006] | [3 Hours] Started rib deburring | | [October 30, 2006] | [0.5 Hours] More deburring | | [October 31, 2006] | [2 Hours] More deburring | | [November 1, 2006] | [3 Hours] Finished deburring ribs | | [November 2, 2006] | [1.5 Hours] Rib prep | | [November 3, 2006] | [2.5 Hours] Finished flanging ribs, started fluting 'em | | [November 4, 2006] | [2.5 Hours] Finished rib prep, started assembly | | [November 5, 2006] | [2.5 Hours] Match drilling ribs | | [November 6, 2006] | [1.5 Hours] Conduit Holes | | [November 7, 2006] | [0.75 Hours] Finished conduit holes | | [November 8, 2006] | Wing wiring ideas | | [November 9, 2006] | [3 Hours] Prepping ribs for priming | | [November 10, 2006] | [4 Hours] Primed ribs | | [November 12, 2006] | Wing jig construction | | [November 13, 2006] | More work on the wing jig | | [November 15, 2006] | Finished wing jig | | [November 17, 2006] | [7 Hours] Riveted main ribs to spars | | [November 18, 2006] | Garage is COLD...BRRRR | | [November 19, 2006] | [1 Hour] Wings got jacked; Marked wing walk doublers | | [November 20, 2006] | [3 Hours] Match drilled left wing walk doubler, clecoed top left skin on, and more brackets | | [November 21, 2006] | [3 Hours] Match drilled left top skins, clecoed right skin on | | [November 22, 2006] | [1 Hour] Finished brackets for right wing | | [November 24, 2006] | [0.5 Hours] Detwisted right wing, clecoed on left wing bottom skin | | [November 25, 2006] | More right wing leveling | | [November 26, 2006] | [3 Hours] Match drilled rest of wing skins | | [November 27, 2006] | [3 Hours] Right leading edge | | [November 28, 2006] | [3.5 Hours] Leading edge work | | [November 29, 2006] | [2 Hours] Finished prep work on leading edges | | [December 28, 2006] | [4 Hours] Deburred Leading edge | | [December 29, 2006] | [3 Hours] Deburred left LE and prepped all LE for priming | | [December 30, 2006] | [4 Hours] Primed and dimpled leading edge parts | | [January 12, 2007] | [0.5 Hours] Prepped inboard leading edge rib and joiner | | [January 13, 2007] | [2 Hours] Riveted nutplates to joiner; clecoed LE | | [January 20, 2007] | [1 Hour] Started riveting right leading edge | | [January 22, 2007] | [2.5 Hours] FINISHED LEADING EDGES | | [January 24, 2007] | [2.5 Hours] Pitot tube mount | | [January 26, 2007] | [3 Hours] Started top skin prep - scarf joint | | [January 27, 2007] | [6.5 Hours] More skin prep - primed skins. | | [January 29, 2007] | [2 Hours] Finished deburring skeleton; fixed access plate countersink | | [January 30, 2007] | [1.75 Hours] Countersunk right spar | | [January 31, 2007] | [0.75 Hours] More spar countersinking | | [February 1, 2007] | [1 Hour] Finished spar countersinking, started dimpling ribs | | [February 5, 2007] | [1 Hour] Finished rib dimpling. | | [February 6, 2007] | [3 Hours] Finished spar/rib prep | | [February 7, 2007] | [1.25 Hours] Started riveting on right leading edge | | [February 8, 2007] | [2 Hours] Installed right leading edge, Test fit right tank | | [February 9, 2007] | [2.5 Hours] Right skins edge finishing and dimpling | | [February 10, 2007] | [6 Hours] Started riveting on right top skin; left leading edge | | [February 11, 2007] | [3 Hours] Prepped left top skins | | [February 13, 2007] | [1 Hour] Worked on right tank fitting | | [February 14, 2007] | [2.5 Hours] Finished fitting tanks | | [February 15, 2007] | [1 Hour] Tried to level left wing | | [February 16, 2007] | [4 Hours] Finished right wing top skin; fixed left wing twist | | [February 17, 2007] | Built wing cradle | | [February 18, 2007] | [1 Hour] Leveled/detwisted left wing | | [February 19, 2007] | [5.5 Hours] Finished left wing top skin | | [February 23, 2007] | Removed wing jig | | [February 24, 2007] | [2 Hours] Started aileron brackets | | [February 25, 2007] | [2.5 Hours] Aileron bracket/brace, flap brace drilling and deburring | | [February 27, 2007] | [2 Hours] Deburred brackets and braces | | [February 28, 2007] | [2.5 Hours] Prepped and primed brackets and braces | | [March 1, 2007] | [2 Hours] Riveted aileron brackets | | [March 2, 2007] | [2 Hours] Rivets aileron brace; Bottom skin pitot cutout | | [March 3, 2007] | [4 Hours] Deburred bottom skins | | [March 12, 2007] | Wings Inspected | | [March 27, 2007] | [3 Hours] Started pushrods | | [March 28, 2007] | [3 Hours] Pushrod work | | [March 29, 2007] | [1.5 Hours] Prepped pushrods and bottom skins for priming | | [March 30, 2007] | [4 Hours] Primed bottom skins; finished pushrods | | [March 31, 2007] | [4 Hours] Dimpled bottom skins | | [April 5, 2007] | [2 Hours] Drilled and countersunk flap brace | | [April 6, 2007] | [2 Hours] Riveted flap brace, prosealed conduit | | [April 9, 2007] | [1.5 Hours] Started riveting right bottom inboard skin | | [April 10, 2007] | [2.5 Hours] Finished bottom right inboard skin, started outboard | | [April 11, 2007] | [2.5 Hours] Finished right wing! | | [April 20, 2007] | Heated pitot tube arrived | | [April 26, 2007] | [0.5 Hours] Heated pitot testing | | [April 28, 2007] | [0.5 Hours] Pitot tube routing research | | [April 30, 2007] | [2 Hours] Started left bottom inboard skin | | [May 2, 2007] | [2 Hours] Finished riveting left bottom inboard skin | | [May 3, 2007] | [2 Hours] Working on bellcrank bushings and pitot tube routing | | [May 4, 2007] | [2 Hours] Finished pitot tube installation tasks | | [June 13, 2007] | [2.5 Hours] Finished riveting left bottom skins | | [June 20, 2007] | [1 Hour] Installed left aileron bellcrank | | [June 21, 2007] | [1.5 Hours] Installed left aileron | | [September 18, 2007] | [6 Hours] Aligned left aileron; mounted flap | | [October 9, 2007] | [4 Hours] Mounted right flap/Aileron - FINISHED WINGS! | | [March 17, 2008] | [1.5 Hours] Installed nutplates for inspection panels |
Fuel Tanks [114.3 Hours]
| [November 30, 2006] | [2 Hours] Started right wing Z brackets | | [December 1, 2006] | [8 Hours] Finished right z-brackets. Got right tank on. | | [December 2, 2006] | [3 Hours] Right tank match drilling. Worked on angle attachment | | [December 5, 2006] | [2 Hours] Left tank Z-brackets | | [December 7, 2006] | New drill press | | [December 8, 2006] | [1 Hour] More left z-bracket work | | [December 9, 2006] | [1 Hour] Finished left z-brackets | | [December 10, 2006] | [3 Hours] Left tank work | | [December 11, 2006] | [2.5 Hours] Left tank match drilling, started angle attatchment | | [December 12, 2006] | [2 Hours] Misc tank work | | [December 13, 2006] | [1.75 Hours] Finished Stiffeners, started capacitive fuel sensor | | [December 16, 2006] | [3 Hours] Capacitive senders, access hole | | [December 17, 2006] | [4 Hours] Anti-rotation bracket, access panel work | | [December 18, 2006] | [2 Hours] Fuel cap / Drain drilling | | [December 21, 2006] | [0.25 Hours] Finished tank prep | | [December 22, 2006] | [4 Hours] Deburred Tank Parts | | [December 23, 2006] | [5 Hours] Skin Prep | | [December 26, 2006] | [2 Hours] Final preps before sealing | | [December 27, 2006] | [5 Hours] Riveted stiffeners for both tanks | | [December 28, 2006] | [3 Hours] Riveted gas cap and fuel drain | | [December 29, 2006] | [1.5 Hours] Deburred baffels, prepped z-brackets for priming | | [December 30, 2006] | [3.5 Hours] Primed z-brackets, cleaned parts, riveted my first rib | | [January 2, 2007] | [3.5 Hours] Riveted two more ribs on right tank | | [January 3, 2007] | [2.5 Hours] Another interior rib down on the right tank. | | [January 4, 2007] | [2.75 Hours] Riveted last interior rib on right tank. Prepped left tank | | [January 5, 2007] | [5.25 Hours] Riveted 3 interior ribs on left tank | | [January 6, 2007] | [8.5 Hours] Finished left tank interior ribs. Misc work on right tank. | | [January 7, 2007] | [3 Hours] Misc work on left tank. Resealed iffy spots. | | [January 8, 2007] | [1 Hour] Misc tank prep | | [January 9, 2007] | [5 Hours] Sealed inboard and outboard ribs on right tank | | [January 10, 2007] | [2 Hours] Right tank capacitive fuel sender | | [January 11, 2007] | [1.5 Hours] Access Panels; finished capacitive sender on right tank | | [January 12, 2007] | [2.5 Hours] Riveted left inboard rib | | [January 13, 2007] | [2 Hours] Riveted left outboard rib. | | [January 14, 2007] | [1.5 Hours] Final prep before closing right tank | | [January 15, 2007] | [1 Hour] More prep on right tank | | [January 16, 2007] | [4 Hours] Installed right baffle | | [January 17, 2007] | [3 Hours] Finished right tank! Finished capacitive sender in left tank. | | [January 18, 2007] | [1.5 Hours] Leak tested right tank; Prep work on left | | [January 20, 2007] | [3.5 Hours] Installed left baffle | | [January 24, 2007] | [0.5 Hours] Finished left tank! | | [January 25, 2007] | [0.25 Hours] Started leak test on left tank | | [January 27, 2007] | Finished Fuel Tanks! |
Ailerons [33.5 Hours]
| [March 3, 2007] | [0.5 Hours] Aileron Stiffeners | | [March 4, 2007] | [4 Hours] Finished fabricating stiffeners, deburred skins | | [March 5, 2007] | [3 Hours] Primed stiffeners and skins | | [March 6, 2007] | [4 Hours] Riveted stiffeners | | [March 7, 2007] | [2 Hours] Assembled left aileron | | [March 9, 2007] | [6 Hours] Assembled right aileron; counterweight prep | | [March 10, 2007] | [6 Hours] Prep for priming | | [March 11, 2007] | [6 Hours] Primed; started assembly | | [March 13, 2007] | [2 Hours] Finished Ailerons |
Flaps [29 Hours]
| [March 13, 2007] | [2 Hours] Prepped skeleton; clecoed on bottom ski | | [March 14, 2007] | [2.5 Hours] Shims, Skins and Hinges | | [March 15, 2007] | [1.5 Hours] Fabricated Angle, match drilled top skin | | [March 19, 2007] | [3 Hours] Bent FL-706B, lots of drilling and countersinking | | [March 20, 2007] | [2.5 Hours] Deburred flap parts | | [March 21, 2007] | [2 Hours] Prepped parts for priming. | | [March 22, 2007] | [1.5 Hours] Primed parts | | [March 23, 2007] | [2.5 Hours] Started flap assembly | | [March 24, 2007] | [5 Hours] Left flap assembly | | [March 25, 2007] | [3 Hours] Finished left flap | | [March 26, 2007] | [3.5 Hours] Finished right flap! |
Wingtips [15 Hours]
|