![]() |
![]() |
||||
Today I banged out the last interior rib on the right tank. It feels great to be done all of them. I figured it took about 12 hours to do all 5 ribs. 1.10 oz total of sealant per rib seemed to be the magic number for me to shoot for when mixing proseal. Finally, I clecoed the left skin to all of the ribs and checked allignment. Then I unclecoed the outboard two ribs so I can get banging away on them. My plan is to bring the left tank up to the state that the right tank is in now before I move on.
|
|||||
http://RVplane.com |
Last Modified: October 5, 2024 |