Build Time: 2236 Hours
Flying & Maintenance Time: 1693 Hours
Builders Log
Builder Resources
|
Panel Planning [4.5 Hours]
Panel Cutting [98.8 Hours]
| [December 28, 2008] | [6 Hours] Cut the EFIS and avionics holes in panel | | [December 29, 2008] | [2 Hours] Made angle for avionics | | [January 5, 2009] | [2.5 Hours] Drilled avionics stack support angles to panel | | [January 6, 2009] | [3 Hours] Drilled avionics tray to support angles; cut subpanel | | [January 7, 2009] | [1 Hour] Made transponder support straps | | [January 8, 2009] | [1 Hour] Cut map box door | | [January 10, 2009] | [3.5 Hours] Provisioned for air vents; cut map box cutout | | [January 11, 2009] | [4 Hours] More map box work | | [January 12, 2009] | [1 Hour] Measure Grand Rapids EIS dimensions. | | [January 13, 2009] | [2.5 Hours] Reinforced subpanel for map box cutout, started EIS mounting | | [January 15, 2009] | [4 Hours] Vent Mounts | | [January 23, 2009] | [2 Hours] Finished vent mounts | | [February 14, 2009] | [3 Hours] Reinforced avionics and mapbox cutouts in subpanel | | [February 15, 2009] | [8 Hours] Fabricated left panel support and aux battery tray | | [February 23, 2009] | [2 Hours] Cut EIS holes | | [February 24, 2009] | [3 Hours] Finished EIS cutout. Cut round instrument holes | | [February 25, 2009] | [3 Hours] Finished round instrument cutouts; cutout trim indicators | | [February 27, 2009] | [2 Hours] Parking brake, starter and switch planning | | [February 28, 2009] | [3 Hours] Cut switch holes. | | [March 1, 2009] | [4 Hours] Fabricated support for throttle bracket | | [March 2, 2009] | [1.5 Hours] Finished control support bracket; painted parts | | [March 10, 2009] | [0.5 Hours] Started anti-rotation switch bracket | | [September 12, 2009] | [8 Hours] Odds and ends to finish panel | | [September 14, 2009] | [1.5 Hours] Trying to patch altimeter cutout | | [September 15, 2009] | [1.5 Hours] More hole patching in panel; map box latching mechanism work | | [October 1, 2009] | [2 Hours] Prepped top of panel | | [October 2, 2009] | [1.5 Hours] More panel prep | | [October 4, 2009] | [2.5 Hours] Painted Panel | | [October 5, 2009] | [1.5 Hours] More panel painting | | [October 6, 2009] | [2 Hours] More panel painting | | [October 8, 2009] | [2.5 Hours] More painting | | [October 12, 2009] | [2 Hours] Played around with labels | | [October 13, 2009] | [1 Hour] Success with labels | | [October 14, 2009] | [0.75 Hours] Label Practice | | [October 20, 2009] | [2 Hours] Started labeling panel | | [October 21, 2009] | [3 Hours] Finished labeling main panel | | [October 23, 2009] | [2 Hours] Labeled throttle quadrant | | [October 26, 2009] | [2.5 Hours] Started installing panel |
Wiring [111 Hours]
| [January 29, 2009] | Wiring Planning | | [February 20, 2009] | [1 Hour] Started alternator and starter wiring | | [February 21, 2009] | [6 Hours] Wired battery, starters, alternator, etc.. | | [February 26, 2009] | [3 Hours] Finalized alternator and starter wires | | [February 28, 2009] | [3 Hours] Aux Battery fuse block mount, battery ground Magetometer wire run | | [March 6, 2009] | [1 Hour] Mounted new E-bus, aux batt fuse block | | [March 8, 2009] | [3 Hours] Installed diodes; started wiring up major busses | | [March 16, 2009] | [4 Hours] Finished wiring up bus feeds....Flipped the master! | | [March 18, 2009] | [2.5 Hours] Wired up starter and second EFIS | | [March 19, 2009] | [2.5 Hours] Finished wiring up all busses | | [June 10, 2009] | [1 Hour] Made 12v to 5v adapter for second GPS | | [June 16, 2009] | [2 Hours] Started on avionics harness | | [June 17, 2009] | [2 Hours] Avionics Harness - power NAV1 | | [June 22, 2009] | [2 Hours] Avionics Harness - COM1 and COM2 | | [June 23, 2009] | [2 Hours] Avionics Harness - Pilot and CoPilot Mic, Phones and PTT | | [June 26, 2009] | [2 Hours] Finished Avionics Harness | | [July 31, 2009] | [20 Hours] Avionics wired up, a bunch of work. | | [August 2, 2009] | [4 Hours] Installed remaining avionics and started running wires back | | [August 4, 2009] | [3 Hours] Programmed EIS auxiliary inputs, MAP, EGT/CHT wires | | [August 5, 2009] | [3 Hours] Headset jacks installed zip tie bases | | [August 7, 2009] | [5 Hours] Wired headset jacks, ran magnetometer wire | | [August 8, 2009] | [3 Hours] Installed dimmers | | [August 9, 2009] | [4 Hours] Capacitive Converters, Fuel Pump | | [August 10, 2009] | [2.5 Hours] Started wiring trim indicators | | [August 11, 2009] | [1 Hour] More trim wiring | | [August 12, 2009] | [2.5 Hours] Finished wiring trim system | | [August 13, 2009] | [1.5 Hours] Ran wires for wingtip/tail lights | | [August 17, 2009] | [2 Hours] More wingtip wire work | | [August 18, 2009] | [1 Hour] Finished the mid-fuselage lighring wiring | | [August 19, 2009] | [3.5 Hours] Lots of wiring, little to show... | | [August 20, 2009] | [2 Hours] wired the wig-wag flasher | | [August 24, 2009] | [1.5 Hours] Wired up strobe, nav, taxi and landing lights to switches | | [August 25, 2009] | [3 Hours] Finished switch wiring, started stick wiring | | [August 26, 2009] | [2 Hours] More pilot stick wiring | | [August 28, 2009] | [1.5 Hours] Pilot stick wiring | | [September 6, 2009] | [2.5 Hours] Ran ELT wires started lacing wires groups | | [September 8, 2009] | [2 Hours] Finished co-pilot stick, laced some more wire | | [September 10, 2009] | [2 Hours] Secured wire bundle | | [October 28, 2009] | [1.5 Hours] Installed throttle bracket; wired aux audio |
|