Tonight I mounted the left elevator to the horizontal stabilizer to fill in any inconsistencies between the elevator tip and the HS tip. There was about 1/8" that needed to be filled in. While I was working on the left elevator I started the process of filling the right elevator. More work filling the right elevator. Damn working with Rage Gold is fun. Apply, wait 30 minutes and sand. Can't beat it. I needed to hack out some of the styrofoam I filled the left HS tip with to make room for the left elevator to swing through smoothly. So I filled in the tip again. No biggie, but just some more wasted time. The left elevator and HS tip are looking like they are going to be finished soon! Notice: Undefined variable: categoryid in /Websites/rvplane.com/public_html/main.php on line 160
|
|||||