Tonight was my first weeknight working on the project at the hangar. First up was wiring up the pitot heat. After some crimping of connectors I had the pitot heat controller wires up and the pitot tube got hot when I turned on the pitot heat. Another thing finished! Next was rigging up the bellcrank with the aileron pushtubes. I torqued everything down and torque sealed it. Next I hung the aileron. And rigged it to the pushtubes. Its pretty unreal to be hooking all of this up for the last time. I mounted the left flap too just to get it out of the way. Next I needed to prep the right wing to be mounted. I drilled a 3/8" hole in the bottom right wing for the Grand Rapids outside air temperature (OAT) probe to be mounted. I routed the wire through the rib with a rubber grommet. Next I ran two runner strings down the conduit. One string goes 1/2 way down the wing for the autopilot and OAT sensor. The other string goes all the way down the wing for the landing lights nav lights. Notice: Undefined variable: categoryid in /Websites/rvplane.com/public_html/main.php on line 160
|
|||||
http://RVplane.com |
Last Modified: October 5, 2024 |