[May 18, 2022]


I got a lot of items wrapped up tonight regarding the annual - finished the fuselage and installed all of the inspection panels, inspected the wings, installed and torqued the top spark plugs and performed a pressure and vacuum test on the fuel system. All that is remaining is the run-up test, which will hopefully be tomorrow.