Panel Planning [4.5 Hours]
  [July 1, 2008]: [2.5 Hours] Measuring panel interfernce with subpanel
  [September 15, 2008]: Panel Finalized
  [September 23, 2008]: Ordered EFIS's
  [October 21, 2008]: Grand Rapids EFIS's arrive
  [October 31, 2008]: [2 Hours] Fired up GRT EFIS's

Panel Cutting [98.75 Hours]
  [December 28, 2008]: [6 Hours] Cut the EFIS and avionics holes in panel
  [December 29, 2008]: [2 Hours] Made angle for avionics
  [January 5, 2009]: [2.5 Hours] Drilled avionics stack support angles to panel
  [January 6, 2009]: [3 Hours] Drilled avionics tray to support angles; cut subpanel
  [January 7, 2009]: [1 Hour] Made transponder support straps
  [January 8, 2009]: [1 Hour] Cut map box door
  [January 10, 2009]: [3.5 Hours] Provisioned for air vents; cut map box cutout
  [January 11, 2009]: [4 Hours] More map box work
  [January 12, 2009]: [1 Hour] Measure Grand Rapids EIS dimensions.
  [January 13, 2009]: [2.5 Hours] Reinforced subpanel for map box cutout, started EIS mounting
  [January 15, 2009]: [4 Hours] Vent Mounts
  [January 23, 2009]: [2 Hours] Finished vent mounts
  [February 14, 2009]: [3 Hours] Reinforced avionics and mapbox cutouts in subpanel
  [February 15, 2009]: [8 Hours] Fabricated left panel support and aux battery tray
  [February 23, 2009]: [2 Hours] Cut EIS holes
  [February 24, 2009]: [3 Hours] Finished EIS cutout. Cut round instrument holes
  [February 25, 2009]: [3 Hours] Finished round instrument cutouts; cutout trim indicators
  [February 27, 2009]: [2 Hours] Parking brake, starter and switch planning
  [February 28, 2009]: [3 Hours] Cut switch holes.
  [March 1, 2009]: [4 Hours] Fabricated support for throttle bracket
  [March 2, 2009]: [1.5 Hours] Finished control support bracket; painted parts
  [March 10, 2009]: [0.5 Hours] Started anti-rotation switch bracket
  [September 12, 2009]: [8 Hours] Odds and ends to finish panel
  [September 14, 2009]: [1.5 Hours] Trying to patch altimeter cutout
  [September 15, 2009]: [1.5 Hours] More hole patching in panel; map box latching mechanism work
  [October 1, 2009]: [2 Hours] Prepped top of panel
  [October 2, 2009]: [1.5 Hours] More panel prep
  [October 4, 2009]: [2.5 Hours] Painted Panel
  [October 5, 2009]: [1.5 Hours] More panel painting
  [October 6, 2009]: [2 Hours] More panel painting
  [October 8, 2009]: [2.5 Hours] More painting
  [October 12, 2009]: [2 Hours] Played around with labels
  [October 13, 2009]: [1 Hour] Success with labels
  [October 14, 2009]: [0.75 Hours] Label Practice
  [October 20, 2009]: [2 Hours] Started labeling panel
  [October 21, 2009]: [3 Hours] Finished labeling main panel
  [October 23, 2009]: [2 Hours] Labeled throttle quadrant
  [October 26, 2009]: [2.5 Hours] Started installing panel

Wiring [111 Hours]
  [January 29, 2009]: Wiring Planning
  [February 20, 2009]: [1 Hour] Started alternator and starter wiring
  [February 21, 2009]: [6 Hours] Wired battery, starters, alternator, etc..
  [February 26, 2009]: [3 Hours] Finalized alternator and starter wires
  [February 28, 2009]: [3 Hours] Aux Battery fuse block mount, battery ground Magetometer wire run
  [March 6, 2009]: [1 Hour] Mounted new E-bus, aux batt fuse block
  [March 8, 2009]: [3 Hours] Installed diodes; started wiring up major busses
  [March 16, 2009]: [4 Hours] Finished wiring up bus feeds....Flipped the master!
  [March 18, 2009]: [2.5 Hours] Wired up starter and second EFIS
  [March 19, 2009]: [2.5 Hours] Finished wiring up all busses
  [June 10, 2009]: [1 Hour] Made 12v to 5v adapter for second GPS
  [June 16, 2009]: [2 Hours] Started on avionics harness
  [June 17, 2009]: [2 Hours] Avionics Harness - power NAV1
  [June 22, 2009]: [2 Hours] Avionics Harness - COM1 and COM2
  [June 23, 2009]: [2 Hours] Avionics Harness - Pilot and CoPilot Mic, Phones and PTT
  [June 26, 2009]: [2 Hours] Finished Avionics Harness
  [July 31, 2009]: [20 Hours] Avionics wired up, a bunch of work.
  [August 2, 2009]: [4 Hours] Installed remaining avionics and started running wires back
  [August 4, 2009]: [3 Hours] Programmed EIS auxiliary inputs, MAP, EGT/CHT wires
  [August 5, 2009]: [3 Hours] Headset jacks installed zip tie bases
  [August 7, 2009]: [5 Hours] Wired headset jacks, ran magnetometer wire
  [August 8, 2009]: [3 Hours] Installed dimmers
  [August 9, 2009]: [4 Hours] Capacitive Converters, Fuel Pump
  [August 10, 2009]: [2.5 Hours] Started wiring trim indicators
  [August 11, 2009]: [1 Hour] More trim wiring
  [August 12, 2009]: [2.5 Hours] Finished wiring trim system
  [August 13, 2009]: [1.5 Hours] Ran wires for wingtip/tail lights
  [August 17, 2009]: [2 Hours] More wingtip wire work
  [August 18, 2009]: [1 Hour] Finished the mid-fuselage lighring wiring
  [August 19, 2009]: [3.5 Hours] Lots of wiring, little to show...
  [August 20, 2009]: [2 Hours] wired the wig-wag flasher
  [August 24, 2009]: [1.5 Hours] Wired up strobe, nav, taxi and landing lights to switches
  [August 25, 2009]: [3 Hours] Finished switch wiring, started stick wiring
  [August 26, 2009]: [2 Hours] More pilot stick wiring
  [August 28, 2009]: [1.5 Hours] Pilot stick wiring
  [September 6, 2009]: [2.5 Hours] Ran ELT wires started lacing wires groups
  [September 8, 2009]: [2 Hours] Finished co-pilot stick, laced some more wire
  [September 10, 2009]: [2 Hours] Secured wire bundle
  [October 28, 2009]: [1.5 Hours] Installed throttle bracket; wired aux audio